There are only two seasons in the Midwest, winter and construction.

Usually my GPS takes me on the strangest routes from Point A to Point B. It's even worse during construction season. Thank goodness for the orange signs pointing me in the right direction.

John Gomez, Think Stock
John Gomez, Think Stock
loading...

The latest road closure for the Stateline area will be the east leg of Roscoe Road from Route 2 to about a quarter mile east of Route 2, according to WTVO.

This construction project is expected to last for no longer than 90 days. There will be detours posted.

 

More From 96.7 The Eagle